Go Back   GZ 250 Forums > GZ250-Specific > Gadgets & Farkles

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 01-28-2014, 07:28 PM   #11
grasshopper
Senior Member
 
grasshopper's Avatar
 
Join Date: Dec 2013
Location: manning, sc
Posts: 484
this fishtail pipe was 30 inches long. I had to cut a few inches off and cut the bracket off the front and cut the rear bracket shorter and drill a hole to mount it in the factory position. I also had to cut a few inches off the header pipe where the two come together. I don't have a torch or a welder so I had to make an angle cut on the header pipe to try to keep the fishtail even with the swing arm. it is mounted temporary right now. it has a gap that needs to be fixed. my friend is gonna fix and weld it for me. I put the factory plate over the connecting pipes. the header slides into the fishtail about three inches.



Login or Register to Remove Ads
grasshopper is offline  
Reply With Quote
 



Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 11:37 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.