Register Community Calendar Today's Posts Search

Go Back   GZ 250 Forums > GZ250-Specific > Instructional Articles

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 07-02-2014, 06:29 PM   #1
benmb
Junior Member
 
Join Date: May 2014
Location: Myrtle Beach SC
Posts: 15
Raising Fuel Tank

Pulling all the plastic off the bike, realized I need a place to put all the electronics...

Fuel tank by design has a large amount of space underneath.. Using short 1" riser pieces at the fuel tank bottom bolts most of the electronics fit right in that pocket between pod filter and fuel tank..

Adding a little more (and making bike look a little bigger) sounded like fun..

This one is untested yet.. I will let you all know once Thumper is back together..

1" x 3" steel pipe nipple, with 1" wide 5/8" deep 90 degree notch cut halfway or so. Rubber grommets on both end, a ton of electrical tape wrapped on ends (the original rubber pieces on the bike measure about 1 1/16")...

Drilled 3/8" hole though pipe nipple, and frame pipe right above the current welded rod piece that holds the rubber bumpers..

Initial Fitup looked good, want a little more rubber for cushioning. Will report back after a few miles. Can be removed for changing fuel tank if needed..
Attached Images
File Type: jpg fuel tank riser.jpg (47.3 KB, 53 views)
File Type: jpg naked gz.jpg (95.9 KB, 54 views)



Login or Register to Remove Ads

Last edited by jonathan180iq; 07-03-2014 at 09:06 AM.
benmb is offline  
Reply With Quote
 




Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 06:39 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.